The development of project plans, specifications, inspections and reviews are provided by Facilities Management staff. Consultants, contractors, and University staff must follow the Design Guidelines for the design, construction, and renovation of University-owned facilities.
Please Note:
- The Design and Construction Manual updates are only accepted by submitting the online Design Manual Update Request form.
01-00 Section 1 Design Guidelines
02-00 Section 2 Construction Guidelines
-
02-01 General Requirements
03-00 Section 3 Appendices and Annexes
-
03- Appendix A - Design Guidelines - Classroom Planning and Design
-
03- Appendix B - Campus Standards for Accessibility and Inclusion
-
03- Appendix I - RFI, Cost of Change, Worksheet, Attic Stock
-
03-Annex C - Not Used
-
03-Annex D - Not Used
-
03-Annex E - Selection and Placement of Recycling and Trash Containers on Campus
-
03- Annex J - Integrated Lifecycle Management (ILM) Plan (BIM)
-
03-Annex L - UNCC FMCS DDC NIAGARAAX Control System Graphics